Passive fire protection

Intumescent
coatings

Specialist protection for structural steelwork, delivered across the UK and Europe.

30–240 minutes fire resistance
Specialist contractors

Protecting critical steelwork without compromising the finish.

RLP Painting Contractors provide specialist intumescent coating and passive fire protection services for commercial, industrial and infrastructure projects.

Our experienced operatives apply high-performance systems in accordance with manufacturer specifications, supported by stringent quality control at every stage.

UK & Europe Project coverage
Controlled Application process
Documented Quality assurance
RLP operative applying a specialist coating to structural steelwork Specialist application, controlled from preparation to sign-off.
Where we work

Built for demanding environments.

Coating systems specified and applied for some of the most complex built environments.

Aerial view of a data centre
01

Data centres

Aerial view of Old Trafford stadium
02

Stadiums & arenas

Modern commercial office building
03

Commercial offices

Distribution warehouse with loading bays
04

Distribution warehouses

The science

How intumescent coatings protect steel.

Under normal conditions, the system appears as a smooth decorative finish. During a fire, it transforms into a thick insulating barrier that delays the steel temperature rise.

01 Before the fire

The steel is coated with intumescent paint. At normal temperatures, it looks like a smooth paint film.

02 Heat exposure

Above approximately 200°C, the coating begins to soften and react to the increasing heat.

03 Intumescent reaction

The coating rapidly expands many times its original thickness, forming a thick insulating char.

04 Steel protection

The char insulates the steel, helping it retain its strength and load-bearing capacity for longer.

✓ The result Fire resistance & life safety
  • Delays the steel temperature rise
  • Maintains load-bearing capacity
  • Provides critical evacuation time
Specified performance

Protection measured in minutes. Confidence built to last.

Systems are selected to meet the fire-resistance period required by the project specification.

30minutes
60minutes
90minutes
120minutes
Trusted systems

Experienced with leading manufacturers.

Applied in line with manufacturer guidance and project specifications.

Discuss your project

Need a compliant intumescent coating system?